Applicable Machine Model: A-MF 82-70 / 82-90 / 82-90XLI
Component of: Gear box
Position on Machine: Pinspotters
Material: Metal
Weight: 9.5kg / pc
Size: 22.5cm*26cm*25c
The front end gearboxes are shipped installed on the pinspotter. Before initial operation, it is necessary to verify that the oil level is correct and to replace the solid fill plug with the breather plug and vent extension.
Replace the gearbox oil following every 2500 hours of pinspotter operation, or every 6 months, whichever occurs first. The amount of oil needed for each front end gearbox is 3.15 pints (1.5 liters). The oil can be drained with the gearbox installed on the pinspotter or removed to a work area. If draining the oil with the gearbox installed in the pinspotter, take adequate precautions to collect the waste oil and prevent it from dripping onto the pinspotter or the lane surface.
Hot Tags: bowling gearbox for A-MF, manufacturers, suppliers, factory, company, bowling, high quality, A-MF, B-runswick

